• Kogasa@programming.dev
    link
    fedilink
    arrow-up
    17
    ·
    1 year ago

    I was quite surprised that they introduced a new scheduler and replaced CFS with it in the same step. I would have expected it to become available, then default, then replace CFS. But I guess this should be interpreted as indicating they have tested it extensively already, with very low chance of significant regressions.