oh, no, it’s far worse than that. the last 90% is enough time to make what you thought was the first 90% become 10%.
so 0.9*expected time = 0.1* actual time
which, if you can do some very basic algebra, results in 900%. this implies that every project will seem “almost done” for about 9x the length of time you thought the project would take. in my experience, this is roughly correct
oh, no, it’s far worse than that. the last 90% is enough time to make what you thought was the first 90% become 10%.
so 0.9*expected time = 0.1* actual time
which, if you can do some very basic algebra, results in 900%. this implies that every project will seem “almost done” for about 9x the length of time you thought the project would take. in my experience, this is roughly correct
As someone who has been working on a “almost done” Task for 2 years I can confirm.